Evidence from practice
Results we can show.
Anonymised mandates from interim management, audit support, chemical-technical projects and international supplier work — each documented to the same pattern.
How to read each case
Five mandates in detail
- Plastics processing
- Injection moulding + extrusion
- Mid-sized company · Lower Austria
- 6 months
Interim plant management at an industrial plastics processor
After the plant manager's abrupt departure: operational plant management taken over ad interim — process windows fixed, set-up times cut with SMED, incoming goods inspection extended by rapid rheological tests.
Read the caseDelivery capability 100 % stable from week two, scrap rate lowered for good, area handed over turnkey to the new in-house successor.
- Speciality chemicals
- ISO 9001 + 14001 IMS
- SME
- 9 months
Building an IMS to ISO 9001 and ISO 14001 at a mid-sized chemical company
To be listed with international system customers: gap analysis, lean digital process documentation from raw material purchasing to release analytics, internal audits to ISO 19011 and a waste concept compliant with the Austrian Waste Management Act.
Read the caseCertification at the first attempt without a single major nonconformity — management now uses the IMS as a direct steering tool.
- Speciality chemicals
- Polymer coating
- Scale-up laboratory → series
- approx. 12 months
Scale-up and technology transfer of a modified polymer system
From the development laboratory to the large batch: critical process parameters analysed directly at the mixing plants, stirring geometries adapted, temperature control of the exothermic reaction phase redesigned and validated closely.
Read the caseProcess established on an industrial scale, viscosity tolerances reliably met, faulty batches eliminated entirely — handed over with complete documentation.
- Plastic injection moulding
- Waste Management Act concept + incoming inspection
- SME
- 4 months
Waste management concept and incoming goods inspection at a plastics processor
Dual mandate: a legally sound waste management concept for submission to the authorities under ÖWAV guidelines, and in parallel a lean test routine for virgin and secondary polymers — melt flow rate, moisture and density per delivery.
Read the caseWaste management concept accepted by the authority without further requests, complaint rate lowered significantly, inspection concept seamlessly integrated into the ISO 9001 system.
- Plant engineering
- Tool procurement in India
- ISO 19011 audit + FAT
- 3 on-site trips
Supplier qualification and FAT in India for an Austrian plant manufacturer
Before the contract was awarded: initial audits of two plants in the Delhi region directly on the line — machine capability, test equipment, the quality management system as practised. Then support for the factory acceptance tests with clear stage gates.
Read the caseBoth tools accepted in the first FAT run, commissioning in Austria on schedule — both suppliers have since become regular suppliers.
Confidentiality is a core value of every mandate: all cases are anonymised so that no conclusions can be drawn about internal matters. Specific references are named on request after express approval.
Typical warning signs
When an initial meeting is worthwhile.
These indicators often make an assignment worthwhile — if several apply, we are happy to compare your situation with our internal pool of mandates.
A similar situation in your company?
Tell us what you are planning — we will check whether there is a case with a comparable profile.
Arrange a meeting
