Specialist area · Waste management & waste law
Waste management concepts grounded in operational reality.
Preparation and updating of legally sound waste management concepts (AWK) in accordance with the strict requirements of the Austrian Waste Management Act.
Request a specialist discussionWhat it is about
A legally required waste management concept must not be a lifeless folder on the shelf that exists only for the authority. A practical AWK maps the real material flows of your company precisely. It lists all types of waste according to the current waste catalogue, documents the internal logistics routes and defines concrete measures for waste prevention and recovery.
It is prepared with profound lead auditor competence according to ISO 14001 and the dual role as former managing director under waste law (AWV Neunkirchen, IPPC/Seveso plants). Existing disposal contracts are reviewed and logistics at the collection points optimised. The result is a fully legally sound document that withstands official inspections and is used in the plant as a real tool for cost optimisation.
Frequently asked questions
From what company size is an AWK required by law?
In Austria, every company with more than 20 employees is legally required to prepare a written waste management concept and to update it in the event of significant changes.
How often must an AWK be updated?
At least every 5 years, and with every significant change to the material flows, the plants or the company organisation. The update follows the ÖWAV guidelines and must be verifiable by the authority.
Prepare a legally sound waste management concept?
Safeguard your plant with a legally compliant and logistically well thought-out AWK.
Request a specialist discussion
